Bathroom reno Sommerville

General Bathroom Details

The tiles are 300mm x 600mm on the floors and walls. A type of pressed slate look was chosen for the floor in a darker shade, the wall tiles are basic white giving this bathroom a crisp and clean look.

The tiles are tiled to the top of the doors approximately to save on taking the ceiling cornice off reducing the cost

Timeline

We were able to fully complete the bathroom in 3.5 weeks, including the fit off of the shower screen

Budget

The budget was quite tight the labour cost for all the labour work was in the vicinity of 9.5k.

We helped with the sizing and where to purchase the fittings and fixtures, they ended up costing approx 4.5k

.

smart-tile-drain
Flexible shower Setting

The lead time for the bathroom renovation in Pearcedale was 6 weeks

A ten percent deposit was paid to secure the allotted time

A discount was given for the payment type

"Time to secure your bathroom reno is now."

Bathrooms built with 100% waterproof backing

WTile backer boards are 100% fully waterproof sheets and we use them on all our bathrooms without question